For metal decks or metal joists you would use a 2 self tapping lag with an eye let.
Wire spacing for drop ceiling.
6 spacing on mains results in cost savings of 10 15 by reducing material hanger wire and installation time simplify your curved drywall installations with our pre notched main beams to create the radius you need.
Allow for drop in lights by adding 2 to the height of the light for clearance.
It is important to use the corresponding length for a and b values according to ceiling joist direction.
The amount of tie wire needed is based on number of support anchors drop of ceiling in inches and additional 4 per individual length.
Installing suspended ceilings assembly andinstallation instructions the ceiling system is made up of armstrong panels either 2 x 4 or 2 x 2 which are supported by a suspension system main beams cross tees and hangers and perimeter molding.
The minimum drop is 3 inches.
Performance features like seismic compliance and fire resistance rely on proper installation.
These screws are easy to use and durable.
There are several different types of fasteners used for hanging drop ceiling wire depending on the application.
The importance of proper ceiling installation.
For plaster you can use a 4 toggle bolt.
Step 1 overview of a drywall drop ceiling grid system.
Wire support anchors are based on 4 per length of main t bar and you may require a few more.
Both however require wire spacing of 4 lineal feet.
It s comprised of a grid that supports 2 x 4 or 2 x 2 ft.
For concrete you would use a split pin or wedge anchor.
The industry standard is to loop and tie the wire ends with three tight turns or use a square knot.
The suspend it eye lag screws for wood joists 100 pack are specifically designed for installation of drop ceilings.
The square knot is the stronger of the two options at 550 lbs.
The l shaped wall angle is usually 20 gage or 25 gage material.
Drywall suspended grid systems are very heavy duty and are more difficult to cut than standard drop ceiling grid systems.
Main beams are on 4 foot centers.
Getting the best performance and visual from your armstrong ceiling relies on proper installation based on the product specification.
This spacing can change.
Always cut ceiling panels face up with a sharp utility knife.
Keep hands clean to avoid smudges on the finished ceiling.
Size is perfect for attaching drop ceiling hanger wire to wood joists.
Main beams run the opposite direction of the joists.